This phased renovation is being performed on a multi-level, 475-space parking garage structure designed for a high level of durability. The concrete floor decks have held up well over nearly 30 years of use, but distinct regions of top-surface spalling (pot holes) have become more evident, indicating the need for intervention.

CVMNEXT Construction oversaw the initial phase of the concrete repair program, sectioning off 150 spaces at a time for repair. In addition to the repairs, CVMNEXT established dust and traffic controls to allow the garage to remain in operation. The next step will be a more aggressive capital expenditure phase, during which multiple levels will be repaired.

Location: Philadelphia, PA