CVMNEXT modified an existing exterior wall at an air hub facility for a major parcel handling company. With the aim of installing three overhead doors as well as a 1,500 SF loading dock, CVMNEXT first modified existing support equipment, including conveyor towers and electrical infrastructure, to create an open platform area, and then designed and erected a three-sided masonry block wall and the appropriate structural support system. The door system was then installed, with CVMNEXT also completing required site work.

Location: Philadelphia, PA